Fire/HVAC Testing: Various St Lucia Buildings

8 Mar 2023

Please be advised there will be a disruption to the air conditioning to the buildings affected below to allow for Fire/HVAC interface testing.

Affected areas

When

  • Start: Tuesday 21 March 2023
  • Finish: Tuesday 21 March 2023
  • Times: 6:00am to 2:00pm

Work details

The design of the air condition system is to shut down during a fire alarm.

Test time should be off no longer than 1 hour per test with a 15 min on period between tests.

With the milder condition expected, the impact will be minimal. 

The system will return to normal after testing.

Contact

Dale Coulson, Service Technician:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest