Air Conditioning Disruptions: Therapies Annexe (84A)

6 Apr 2023

Please be advised there will be a disruption of air conditioning to Therapies Annexe (84A) level 1, 2 and 6 to upgrade the air conditioning control system.

Affected areas

  • Therapies Annexe (84A) levels 1, 2, and 6.

When

  • Start: Tuesday, 11 April 2023
  • Finish: Friday, 14 April 2023
  • Times: 6.00am to 4.00pm

Work details

There will be periodic disruptions to the air conditioning due to power isolation and replacement of the controllers.

We will run air conditioning in manual with fixed cooling while the controls are swapped over

Project details

The air conditioning controls are past end of life and spare parts are no longer available.

The new controllers will be connected to the Building Management System which will improve scheduling, temperature monitoring and setpoint adjustment.

Contact

Neil Brown, Senior Building Systems Engineer:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest