Bathroom Shutdown: Ritchie Research Laboratories (64A)

29 Jun 2023

Please be advised there will be bathrooms shut down to allow for quoted works at Ritchie Research Laboratories.

Affected areas

  • Ritchie Research Laboratories (64A), Level 2 PWD, Level 3 female, Level 4 female & male amenities

When

  • Start: Monday 3 July 2023
  • Finish: Monday 3 July 2023
  • Times: 6:00am to 4:0pm

Work details

Inspect and repair 40mm waste pipes in ceiling space for basins on level 3 and 5.

Replace section of 100mm toilet waste for level 3 female toilet.

Contact

Kyle Norton, AXIS Maintenance

We apologise for the inconvenience this may cause and thank you for your understanding during this time.