Facade Replacement Works: Human Movement Studies (26B) fortnightly lookahead

11 Sep 2023

Human Movement Studies Building (26B) will have some minor disruption as detailed in the below table; The works are a part of the cladding replacement program.

Fortnightly Lookahead:  11 September 2023 to 25 September 2023

Affected Area & Disruption

Time

Date

  • Contractor to remove caulking, top hats and cladding as per Figure 1 below. Please note cladding to be removed to all levels as per area shown below.
  • EWP and scissor lifts to be used. These machines will beep intermittently.
  • Noisy works are expected due to machinery and drilling.
  • Exclusions zones will be in place around machinery causing closures to external pathways.

06:30am – 05:00pm

11 September 2023 to 25 September 2023

Figure 1:

Project details

 

Human Movement Studies Building Façade Replacement project. Refer to the Façade Replacement Program website for more information.

Contact

Johnny Hegerty, Principal Project Officer:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.