Power Shutdown: Biological Sciences Library (94) cold room storage

5 Dec 2023

Please be advised that as part of the Pizza Caffe fit-out project, the contractor will be undertaking works on the Level 1 electrical distribution boards. During these works, there will be a localised power outage to the Pizza Caffe tenancy, Darwin’s Café tenancy and the back of house cold rooms between approximately 6am-9:30am Friday 15 December to Monday 18 December 2023.

The contractor proposes to shut down power once a day early in the morning for 2-3 hours, typically between 6am and 9:30am. However, please be advised that these times are approximate and may vary depending on the works.

 

When:

  • Start: Friday 15 December 2023
  • Finish: Monday 18 December 2023
  • From 6:00am to 9:30am (times are approximate)

Affected Areas:

  • Power outage to the Pizza Caffe tenancy, Darwin’s Café tenancy and the back of house Darwin’s and Bagel Boys cold rooms.

Preparation:

  • Shut down all equipment that may be sensitive to power cycling, such as computers.
  • Plan to avoid accessing fridges and freezers.

Apologies for any inconvenience this may cause and for the late notice.

Contact:

Kevin Park, Project Manager:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.