The Physiology Lecture Theatres (63) forms part of the UQ Façade Replacement Program. As part of these works the cladding on the Physiology building will be replaced.
This notification provides a lookahead for the upcoming works and important changes to access to and around the building during this time.
Works at Physiology Lecture Theatres building are expected to run from October 2023 to August 2024.
Affected Area & Disruption | Time | Date |
Physiology Lecture Theatres | ||
Site Compound
| 6am to 5pm | 30/10/23 – 3/11/23 |
Northern Entry
| 6am to 5pm | 30/10/23 – 1/11/23 |
Southern Entry
| 6am to 5pm | 2/11/23 – 3/11/23 |
Figure 1: Physiology Lecture Theatres Cladding Replacement – Scaffold Build Stage 1
Figure 2: Physiology Lecture Theatres Cladding Replacement – Scaffold Build Stage 2
Work details
St Lucia West Package Cladding Replacement. Refer to the Façade Replacement Program webpage for more information.
Project details
St Lucia (West Package) cladding replacement project.
Contact
Mel Marke, Associate Director (Infrastructure):
- Call: 0429 885 361
- Email: m.marke@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.