Please be advised, there will be a power shut to Sir Llew Edwards (14). This is to allow for construction works in room 219.
Affected areas
- Sir Llew Edwards Building (14), level 2. The power shut down will only affect rooms 215 to 219 and adjacent corridors.
When
- Start: Thursday 13 April 2023
- Finish: Thursday 13 April 2023
- Times: 6:00am to 7:30am
Work details
- Electrical distribution board 2.1 is to be shutdown.
- The power shutdown is to allow for construction works to refurbish room 219 to provide a new Central Controlled Teaching room
- The contractor will provide the necessary safety measures when doing their work to safeguard the public.
Contact
Terence Fredman:
- Call: +61 411 324 874
- Email: t.fredman@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.